IT for Construction Sector
Construction firms balance head-office productivity with multi-site field operations — BIM file management, mobile field documentation, sub-contractor coordination, OHS posture. We design the IT layer to support both.
BIM Files
Large file workflows on SharePoint or specialist BIM platforms.
Field Tablets
Intune-managed iPads/Surface for site engineers and inspectors.
Sub-contractor Access
Controlled SharePoint guest access for sub-contractors.
OHS Documentation
Site safety records, audit trail.
What's different about construction
- Multi-site operations — head office + active project sites — connectivity varies.
- BIM files — large files, complex versioning, multi-discipline coordination.
- Field tablets — for engineers, inspectors, safety officers.
- Sub-contractors — external companies needing limited collaboration access.
- OHS compliance — safety inspection records, training documentation, audit posture.
- KVKK for site personnel — worker identity, presence tracking under appropriate basis.
Frequently chosen with this service
Licenses commonly selected on the same project — each product page has comparisons, FAQ and a quote/cart.
Frequently Asked Questions
For SMB construction, SharePoint can handle BIM file storage with appropriate versioning. For complex multi-discipline coordination, specialist platforms (Autodesk Construction Cloud, Bentley) are typically used; we ensure identity integration with M365 and security posture.
Intune-managed iPads or Surface devices, with offline-capable apps for site documentation, inspection forms (Microsoft Lists, custom Power Apps). Identity via Entra ID with conditional access.
SharePoint guest access via Entra B2B, scoped to specific project sites/folders. Information barriers prevent cross-project information leakage. Audit log records sub-contractor access.
Microsoft Lists / SharePoint document libraries with structured metadata, audit log, retention. Integrates with field tablet capture for accident reports, inspection findings, training attendance.
How Xen Bilişim delivers IT for Construction Sector
- 1. Discovery: Stakeholder interviews, current-state inventory, compliance review and risk mapping; deliverable: written discovery report.
- 2. Plan: Target architecture, SKU/licence selection, migration plan and SLA scope documented; quote signed.
- 3. Implement: Phased rollout with pilot → full deployment; user training and runbook delivered; KVKK/ISO compliance evidence collected.
- 4. Operate: Continuous monitoring, quarterly health-checks, incident response and roadmap reviews — under MSP retainer or project-end transfer.
Typical end-to-end timeline: 4-6 weeks (varies by scope).