Sophos XGS 2100 1U Firewall
Sophos XGS 2100 is the entry of the 1U distributed-edge series. Designed for 200–400 user mid-market or HQ position. 30 Gbps firewall throughput, 6 Gbps IPS, 1.1 Gbps TLS 1.3 inspection. 8x GE copper + 2x SFP fibre + 1 Flexi Port slot (modular expansion). Rack-mount form + optional redundant PSU + Sophos Central management.
30 Gbps Firewall
1U entry-level; throughput for 200–400 users.
Flexi Port Slot
Modular port expansion; future-proof for 10 GbE or bypass modules.
1U + Redundant PSU
Production-ready rack-mount form; datacentre integration.
TLS Inspection 1.1 Gbps
Encrypted traffic inspection for modern HTTPS threats.
Who is XGS 2100 for?
200–400 user mid-market, multi-branch HQ, production/logistics data centres. Rack-mount + redundant PSU for production.
- 200–400 active users
- Datacentre/server room integration
- HA + redundancy required
- 1 Gbps+ internet bandwidth
Distributed Edge Strategy
XGS 2100 HQ + branch XGS 88/108/118 via SD-WAN. Sophos Central single-pane management.
Licensing
Hardware + Annual Subscription (Xstream Protection)
- 1 year
- 3 years (recommended)
- 5 years
Enterprise Support tier optional (4h RMA). Redundant PSU standard.
Who is this for?
Frequently Asked Questions
2300: 39 Gbps fw / 7 Gbps IPS / 1.45 Gbps TLS — higher throughput. 2100 entry 1U; 2300 mid-tier 1U.
Modular port addition: 10 GbE SFP+ module, bypass module (fibre fail-open), or extra GE copper.
Active-Passive HA standard. Active-Active cluster on higher Sophos models.
Above 150 users, fibre backbone + rack mount + HA + redundant PSU.
Via Sophos distributor; Xen Bilişim 1-2 week delivery; expedited for urgency.
Xen Bilişim Deployment Process
- 1. Discovery & sizing: Current environment, user count, OS/cloud distribution and compliance requirements analysed; correct SKU and licence count proposed.
- 2. Pilot deployment: A 10-25 device subset goes live; integration with existing security stack tested; alerting + reporting configured.
- 3. Full rollout: Phased rollout across all endpoints; policy templates applied; user training and IT runbook delivered.
- 4. Optimisation & follow-up: 90-day post-launch tuning: false-positive triage, policy hardening, KPI review and quarterly health-checks.
Typical end-to-end timeline: 2-4 weeks (varies by user count and integration scope).