Sophos XGS 3100 1U Firewall
Sophos XGS 3100 is the mid segment of the 1U distributed-edge series. For 400–700 user mid-large organisations or encryption-heavy environments. 47 Gbps firewall, 10.5 Gbps IPS, 2.47 Gbps TLS 1.3 inspection. 8x GE copper + 2x SFP fibre + 2x SFP+ 10 GE fibre + 1 Flexi Port slot. 10 GbE backbone + high IPS throughput for production data centre.
47 Gbps Firewall + 10.5 Gbps IPS
Mid-large organisation throughput with full IPS.
2x 10 GbE SFP+
Standard 10 GbE backbone; data centre connectivity.
TLS Inspection 2.47 Gbps
High-encryption environment inspection capacity.
Flexi Port Slot
Modular expansion for future port needs.
Who is XGS 3100 for?
400–700 user mid-large organisations, financial services, healthcare hospital networks, production HQ data centre. Encryption-heavy + high concurrent sessions.
- 400–700 active users
- Encryption-heavy (finance/healthcare)
- 10 GbE backbone
- PCI DSS / ISO 27001 / KVKK strict compliance
Sophos Central + 24/7 Monitoring
XGS 3100 + Sophos MDR = enterprise-grade SOC at SMB cost. Telemetry + Endpoint + Email in single SOC view.
Licensing
Hardware + Annual Subscription (Xstream Protection)
- 1 year
- 3 years (recommended)
- 5 years
Enterprise Support recommended. Redundant PSU standard. HA cluster + Active-Active optional.
Who is this for?
Frequently Asked Questions
3300: 58 Gbps fw / 14 Gbps IPS / 3.13 Gbps TLS — higher throughput, same port layout.
Active-Passive standard + Active-Active option (load balanced).
No — separately purchased. Multi-mode (LC fibre) or DAC cable options.
Sophos MDR analysts monitor XGS 3100 telemetry 24/7. SMB+mid-market: MDR + XGS 3100 = enterprise-grade.
500-user org typically below this. Higher-encryption finance benefits from 3300.
Xen Bilişim Deployment Process
- 1. Discovery & sizing: Current environment, user count, OS/cloud distribution and compliance requirements analysed; correct SKU and licence count proposed.
- 2. Pilot deployment: A 10-25 device subset goes live; integration with existing security stack tested; alerting + reporting configured.
- 3. Full rollout: Phased rollout across all endpoints; policy templates applied; user training and IT runbook delivered.
- 4. Optimisation & follow-up: 90-day post-launch tuning: false-positive triage, policy hardening, KPI review and quarterly health-checks.
Typical end-to-end timeline: 2-4 weeks (varies by user count and integration scope).